EXTREME WORDS – BAD FOR ARCHITECTS & ENGINEERS


from DESIGNPRO Insurance Group

EXTREME WORDS – BAD FOR ARCHITECTS & ENGINEERS

Regarding architect and engineering (A/E) client-driven agreements, scope of services, communications to anyone, an A/E’s marketing materials, etc., when the extreme words listed in this article are used they may cause an implied warranty. Warranties are excluded from professional liability insurance policies. Moreover, if these words are inserted into an A/E’s clients’ documents such as an agreement, it may difficult for the A/E firm to quantify or to know when they have finished their contractual duties.

It also may be difficult for A/Es to establish the extent of their basic services for their fee. The extreme words listed below are unneeded in order to make the point in a sentence, and elevate an A/E’s standard of care.

THINK BEFORE YOU AGREE

A very good resource and discussion on this topic is the American Institute of Architects’ (AIA) Best Practices, Chapter 6.01, article “But Words Will Never Hurt Me, Marketing Must Balance Enticement Against Precision” Contributed by Thomas S. Townes, AIA, FSMPS, CPSM and Andrew J. Carlowicz, Jr. https://www.aia.org/best-practices/11226-but-words-will-never-hurt-me

We may believe that liability applies only to our performance or standard of care, but it is important from the outset to promise only what you can deliver; even materials marketing your firm or pursuing a project can expose you to litigation.

Also consider that if an A/E’s client insists that the word “complete” is used in a project agreement, standard language runs contrary to typical construction administration services relating to shop drawings and other submittals. AIA Document B101 (2017), Standard Form Agreement Between Owner & Architect, Article 3.4.1, states:

The Owner and Architect acknowledge that, in order to construct the Work, the Contractor will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals, which the Architect shall review in accordance with Section 3.6.4 (Submittals). (Emphasis added.)

WHAT ARE EXTREME ADJECTIVES?

Adjectives are words that describe the qualities of something. Some adjectives in English are gradable – that means you can have different degrees or levels of that quality. For example, the weather can be a little cold, rather cold, very cold, or extremely cold.

Extreme adjectives or non-gradable adjectives are words that mean “extremely + adjective” – for example, “freezing” means “extremely cold.” The weather can’t be “a little bit freezing” or “very freezing” – because the word “freezing” itself automatically means “extremely cold”.  “Cold” is a regular adjective, and “freezing” is an extreme adjective.  https://www.espressoenglish.net/extreme-adjectives-in-english/

“EXTREME WORDS” USED AGAINST A/E’s IN OWNER-DRIVEN DOCUMENTS

  • All, any or every, of any kind, at all times
  • Highest level of trust or strict compliance
  • Accurate or sufficient for its intended purpose
  • Including but not limited to …
  • Without limitation, or as determined
  • Without limiting the foregoing, unconditionally
  • Notwithstanding anything in this Agreement to the contrary, …
  • In detail, full-scope, entire, fully, or wholly
  • Specialize, expert or expertise
  • Affirm, assure, ensure or insure (same as - guaranty or warranty not covered by professional liability insurance)
  • Adequate or complete (all construction documents are inherently conceptual as no set is “complete”)
  • Best or error free
  • Correct, coordinated or absolutely, totally
  • Necessary, required or other
  • Supervise or inspect and inspections
  • Certify or guarantee
  • Warranty, warrants, covenant
  • Comport with or comply with all laws, rules and regulations
  • Maximize or minimize
  • Final or as-built
  • Proper, orderly final or finalized
  • Good and workmanlike manner
  • Appropriate, or as may be appropriate, most relevant
  • Verify or verification, clearly, indefinitely
  • Timely, time of the essence

From my experience, in reviewing my clients’ agreements and other documents from their clients (project owners) for over 15 years, this list continues to grow over time. These “Extreme Words” may seem innocuous, and in the interest of time or without further thought, an A/E may gloss-over them.

IN CONCLUSION

Below is a sentence as the following in an A/E’s client-driven agreement with extreme words.

A/E shall perform its services in compliance with all laws, rules and regulations to assure that the project will be completed for its intended purpose. (Extreme words highlighted.)

From a risk management perspective, a more appropriate sentence would be:

A/E shall perform it services to take into account applicable laws, rules and regulations, in accordance with its standard of care of its profession.


About the Author

Eric O. Pempus, FAIA, Esq., NCARB has been a risk manager for more than 15 years with experience in architecture, law and professional liability insurance, and a unique and well-rounded background in the construction industry. He has 25 years of experience in the practice of architecture, and as an adjunct professor teaching professional practice courses at the undergraduate and graduate levels for the last 34 years. As a Fellow of the American Institute of Architects and Chair/Hearing Officer of the AIA National Ethics Council, he has demonstrated his impact on architectural profession. He has presented numerous loss prevention and continuing educational programs to design professionals and architectural students in various venues across the United States and Canada.

The above comments are based upon DesignPro Insurance Group’s experience with Risk Management Loss Prevention activities, and should not be construed to represent a determination of legal issues, but are offered for general guidance with respect to your own risk management and loss prevention. The above comments do not replace your need for you to rely on your counsel for advice and a legal review, since every project and circumstance differs from every other set of facts.

Disclaimer: The viewpoints expressed in this article are those of the author(s) and are not necessarily approved by, reflective of or edited by other individual, group, or institution. This article is an expression by the author(s) to generate discussion and interest in this topic.